登录注册
请使用微信扫一扫
关注公众号完成登录
我要投稿
[9] An T,Zhou X,Han C,et al.A DC grid benchmark model for studies of interconnection of power systems[J].CSEE Journal of Power & Energy Systems,2015,1(4):101-109.
[10] 李亚楼,穆清,安宁,等.直流电网模型和仿真的发展与挑战[J].电力系统自动化,2014,38(4):127-135. LiYalou,Mu Qing,An Ning,et al.Development and challenge of modeling and simulation of DC grid[J].Automation of Electric Power System,2014,38(4):127-135(in Chinese).
[11] 魏晓光,高冲,罗湘,等.柔性直流输电网用新型高压直流断路器设计方案[J].电力系统自动化,2013,37(15):95-102. Wei Xiaoguang,Gao Chong,Luo Xiang,et al.A novel design of high-voltage dc circuit breaker in HVDC flexible transmission grid[J].Automation of Electric Power Systems,2013,37(15):95-102(in Chinese).
[12] 王新颖,汤广福,魏晓光,等.适用于直流电网的LCL谐振式模块化多电平DC/DC变换器[J].电网技术,2017,41(4):1106-1113. Wang Xinying,Tang Guangfu,Wei Xiaoguang,et al.LCL-based resonant modular multilevel DC/DC converter for DC grids[J].Power System Technology,2017,41(4):1106-1113(in Chinese).
[13] 贺之渊,汤广福,郑健超.大功率电力电子装置试验方法及其等效机理[J].中国电机工程学报,2006,26(19):47-52. He Zhiyuan,Tang Guangfu,Zheng Jianchao.High power electronics equipment test method and its equivalence mechanism[J].Proceedings of the CSEE,2006,26(19):47-52(in Chinese).
[14] 许建中,李承昱,熊岩,等.模块化多电平换流器高效建模方法研究综述[J].中国电机工程学报,2015,35(13):3381-3392. Xu Jianzhong,Li Chengyu,Xiong Yan,et al.A review of efficient modeling methods for modular multilevel converters[J].Proceedings of the CSEE,2015,35(13):3381-3392(in Chinese).
[15] 姜喜瑞,贺之渊,汤广福,等.基于多Agent架构的高压大容量柔性直流输电阀基控制技术研究[J].中国电机工程学报,2013,33(28):59-66. Jiang Xirui,He Zhiyuan,Tang Guangfu,et al.Research on valve base control technology for high-voltage large-capacity VSC-HVDC systems based on multi-Agent structure[J].Proceedings of the CSEE,2013,33(28):59-66(in Chinese).
[16] 和敬涵,李智诚,王小君,等.计及多种控制方式的直流电网潮流计算方法[J].电网技术,2016,40(3):712-718. He Jinghan,Li Zhicheng,Wang Xiaojun,et al.Power flow algorithm for DC grid considering various control modes[J].Power System Technology,2016,40(3):712-718(in Chinese).
[17] 吴亚楠,吕铮,贺之渊,等.基于架空线的直流电网保护方案研究[J].中国电机工程学报,2016,36(14):3726-3733. Wu Yanan,Lü Zheng,He Zhiyuan,et al.Study on the protection strategies of HVDC grid for overhead line[J].Proceedings of the CSEE,2016,36(14):3726-3733(in Chinese).
[18] 梁益,蔡泽祥,田得良,等.直流线路行波保护解析整定方法[J].电网技术,2017,41(1):298-304. LiangYi,Cai Zexiang,Tian Deliang,et al.Analytical method for travelling wave protection setting of HVDC transmission line[J].Power System Technology,2017,41(1):298-304(in Chinese).
[19] 孙银锋,吴学光,汤广福,等.基于节点阻抗矩阵GS法的直流电网稳态潮流计算[J].中国电机工程学报,2015,35(8):1882-1892. Sun Yinfeng,Wu Xueguang,Tang Guangfu,et al.A nodal impedance matrix based Gauss-Seidel method on steady state power flow calculation of DC power grid[J].Proceedings of the CSEE,2015,35(8):1882-1892(in Chinese).
[20] 刘昇,徐政,唐庚,等.VSC-HVDC机电暂态仿真建模及仿真[J].电网技术,2013,37(6):1672-1677. LiuSheng,Xu Zheng,Tang Geng,et al.Electromechanical transient modeling and simulation for voltage source converter based HVDC power transmission[J].Power System Technology,2013,37(6):1672-1677(in Chinese).
[21] 丁平,安宁,李亚楼,等.基于多速率仿真和简化离散牛顿法的电压源型换流器和直流电网机电暂态模型[J].中国电机工程学报,2016,36(24):6809-6819. Ding Ping,An Ning,Li Yalou,et al.An electromechanical transient model of VSC and DC grid based on multi-rate simulation method and simplified discrete newton method[J].Proceedings of the CSEE,2016,36(24):6809-6819(in Chinese).
[22] 鲁晓军,林卫星,安婷,等.MMC电气系统动态相量模型统一建模方法及运行特性分析[J].中国电机工程学报,2016,36(20):5479-5491. Lu Xiaojun,Lin Weixing,An Ting,et al.A unified dynamic phasor modeling and operating acteristic analysis of electrical system of MMC[J].Proceedings of the CSEE,2016,36(20):5479-5491(in Chinese).
[23] 叶华,安婷,裴玮,等.含VSC-HVDC交直流系统多尺度暂态建模与仿真研究[J].中国电机工程学报,2017,37(7):1897-1908. Ye Hua,An Ting,Pei Wei,et al.Multi-scale modeling and simulation of transients for VSC-HVDC and AC systems[J].Proceedings of the CSEE,2017,37(7):1897-1908 (in Chinese).
[24] An T,Han C,Wu Y,et al.HVDC grid test models for different application scenarios and load flow studies[J].Journal of Modern Power Systems & Clean Energy,2017,5(2):1-13.
[25] Gnanarathna U N,Gole A M,Jayasinghe R P.Efficient modeling of modular multilevel HVDC converters (MMC) on electromagnetic transient simulation programs[J].IEEE Transactions on Power Delivery,2011,26(1):316-324.
[26] Xu J,Zhao C,Liu W,et al.Accelerated model of modular multilevel converters in PSCAD/EMTDC[J].IEEE Transactions on Power Delivery,2013,28(1):129-136.
[27] Saad H,Mahseredjian J,Delarue P,et al.Modular multilevel converter models for electromagnetic transients[J].IEEE Transactions on Power Delivery,2014,29(3):1481-1489.
[28] 易伟平. RTDS中直流输电线路模型的研究[D].北京:华北电力大学,2011.
[29] 严有祥,方晓临,张伟刚,等.厦门±320kV柔性直流电缆输电工程电缆选型和敷设[J].高电压技术,2015,41(4):1147-1153. Yan Youxiang,Fang Xiaolin,Zhang Weigang,et al.Cable section and laying of Xiamen ±320kV flexible DC cable transmission project[J].High Voltage Engineering,2015,41(4):1147-1153(in Chinese).
[30] Mahseredjian J,Dinavahi V,Martinez J A.Simulation tools for electromagnetic transients in power systems:overview and challenges[J].IEEE Transactions on Power Delivery,2009,24(3):1657-1669.
[31] 穆清,周孝信,王祥旭,等.面向实时仿真的小步长开关误差分析和参数设置[J].中国电机工程学报,2013,33(31):120-129. Mu Qing,Zhou Xiaoxin,Wang Xiangxu,et al.Error analysis and parameters of switches in small step simulation for real-time simulation[J].Proceedings of the CSEE,2013,33(31):120-129(in Chinese).
[32] Dufour C,Mahseredjian J,Bélanger J.A combined state-space nodal method for the simulation of power system transients[J].IEEE Transactions on Power Delivery,2011,26(2):928-935.
[33] 纪锋,魏晓光,吴学光,等.线性开关电路电磁暂态分析的状态方程法[J].中国电机工程学报,2016,36(22):6028-6037. Ji Feng,Wei Xiaoguang,Wu Xueguang,et al.Sate space method to analyze the electromagnetic transient of linear switching circuit[J].Proceedings of the CSEE,2016,36(22):6028-6037(in Chinese).
[34] 高阳,刘栋,杨兵建,等.基于MMC的柔性直流输电阀基控制器及其动模试验[J].电力系统自动化,2013,37(15):53-58. Gao Yang,Liu Dong,Yang Bingjian,et al.MMC based valve base controllers of HVDC flexible and their dynamic simulation experiment[J].Automation of Electric Power Systems,2013,37(15):53-58(in Chinese).
[35] 孙银锋,吴学光,李国庆,等.基于等时间常数的模块化多电平换流器柔直换流阀动模系统设计[J].中国电机工程学报,2016,36(9):2428-2437. Sun Yinfeng,Wu Xueguang,Li Guoqing,et al.Design of MMC dynamic simulation system based on equal time constant[J].Proceedings of the CSEE,2016,36(9):2428-2437(in Chinese).
[36] 刘栋,汤广福,贺之渊,等.模块化多电平柔性直流输电数字-模拟混合实时仿真技术[J].电力自动化设备,2013,33(2):68-73. Liu Dong,Tang Guangfu,He Zhiyuan,et al.Hybrid real-time simulation technology for MMC-HVDC[J].Electric Power Automation Equipment,2013,33(2):68-73(in Chinese).
[37] 郭剑波,周俊,郭强,等.华北-华中-华东交直流输电系统数模混合仿真[J].电网技术,2011,35(9):55-59.Guo Jianbo,Zhou Jun,Guo Qiang,et al.Digital and analog hybrid simulation of interconnected UHVAC/UHVDC transmission system from north China via central China to east China[J].Power System Technology,2011,35(9):55-59(in Chinese).
[38] 李国庆,谷怀广,吴学光,等.MMC功率接口稳定性分析方法及改进措施[J].电力自动化设备,2016,36(2):5-10. Li Guoqing,Gu Huaiguang,Wu Xueguang,et al.Analysis of MMC power interface stability and improvement measures[J].Electric Power Automation Equipment,2016,36(2):5-10(in Chinese).
特别声明:北极星转载其他网站内容,出于传递更多信息而非盈利之目的,同时并不代表赞成其观点或证实其描述,内容仅供参考。版权归原作者所有,若有侵权,请联系我们删除。
凡来源注明北极星*网的内容为北极星原创,转载需获授权。
2月21日上午,京津冀能源协同发展行动计划新闻发布会在市发展改革委举行,市发展改革委、市城市管理委、市经济和信息化局相关负责人出席,并介绍有关情况。近日,经京津冀三地政府批准,市发展改革委联合天津市发展改革委、河北省发展改革委共同编制印发京津冀能源协同发展行动计划(以下简称《行动计
12月9日,2022~2023年度国家优质工程奖评选揭晓,由国网冀北电力投资建设管理的张北柔性直流电网试验示范工程荣获国家优质工程金奖。这是该工程继2022年获得第七届中国工业大奖后,再次斩获国家级殊荣。国家优质工程奖设立于1981年,由国家发展和改革委员会主管,中国施工企业管理协会主办。倡导“追
8月30日晚,随着±500千伏康巴诺尔、阜康换流站各作业面验收完成进入空载加压试验阶段,张北柔性直流电网工程三座换流站2023年度检修工作圆满完成。国网冀北超高压公司应用“自主管控检修”模式,打造“五级四化”管理体系,分级分类开展安全培训,推进现场“网格化管理”,对交叉作业、高空作业、吊车
3月19日,第七届中国工业大奖发布会在京召开。国家电网有限公司张北柔性直流电网试验示范工程荣获本届中国工业大奖。这是继1000千伏晋东南—南阳—荆门特高压交流试验示范工程、青藏电力联网工程、国家风光储输示范工程、向家坝—上海±800千伏特高压直流输电示范工程和巴西美丽山特高压输电二期项目后
绿电即绿色电力,是指通过风力发电、水力发电和太阳能光伏等这样的手段,由可再生能源转化成的电能。在北京2022年冬奥会期间,所有的场馆都将采用绿电来供应。北京冬奥组委规划建设部部长刘玉民13日表示表示,三个赛区当中,张家口赛区和延庆赛区都有丰富的清洁能源储备,能够保证冬奥场馆绿电的供应。
日前,中国电力科学研究院有限公司与国网经济技术研究院有限公司、南京南瑞继保工程技术有限公司组成的联合攻关团队,在张北柔直工程±500千伏中都换流站成功完成柔性直流与新能源振荡复现及抑制现场试验,开展柔直与新能源振荡的现场在线复现、在线抑制,实现柔直与新能源振荡现象与抑制的理论推导、仿真分析与现场复现的一致性比对,为解决电力电子网络振荡问题提供理论支撑。
目前,清洁能源外送、柔直示范、主网强化、智能配网、清洁供暖、高铁配套冬奥“六大工程”全部建成投运,500千伏多路通道、220千伏双环网、110千伏双链式、10千伏电缆双环网的高可靠供电体系搭建完毕。其中,最值得一提的是柔直示范,该工程是最年轻的团队用最短时间攻克了世界最高电压等级和最高技术含量的工程,创造了12项世界第一。
2021年3月30日,工业和信息化部产业发展促进中心在北京组织开展了国家重点研发计划项目《高压大容量柔性直流电网关键技术研究与示范》的综合绩效评价。
3月12日,张北可再生能源柔性直流电网示范工程在北京通过了国家电网有限公司组织的工程竣工环境保护专项验收。国家电网投资建设的张北可再生能源柔性直流电网示范工程,新建北京换流站、丰宁换流站、康保换流站、张北换流站、±500kV直流输电线路工程,涉及北京市、河北省。工程于2018年2月开工建设,2020年6月投入运行。
2月23日,中国电力科学研究院有限公司计量所工程师贾福泉开展新能源汽车充电桩内置计量器具试验检测。这种方法采用直流电能计量检测技术,可检验新能源汽车充电桩计量特性。中国电科院切实提升计量测试能力、计量科技创新能力和运行能力水平,自2017年11月以来,推进国家智能电网量测系统产业计量测试
今天上午,2021年全国能源工作会议在北京召开。国家能源局党组书记、局长章建华作题为《深入贯彻落实能源安全新战略为全面建设社会主义现代化国家提供坚强能源保障》的报告。中电传媒记者第一时间带您速览“十三五”能源发展成绩单1.非化石能源消费比重超过15%,能源清洁低碳转型加速“十三五”期间,
3月18日,位于河北邯郸的±800千伏陇东—山东特高压直流输电工程冀1标段的施工现场一派繁忙。河北省送变电有限公司的作业人员有条不紊地开展灌注桩基础施工。伴随着一阵轰鸣声,旋挖钻机钻头高速旋转,垂直深入地下。陇东—山东特高压直流输电工程冀1标段起于山西平顺县与河北涉县交界处,止于山东莘县
3月15日上午,陕北—安徽±800kV特高压直流输电工程送端(富县)换流站项目开工。宝塔山换流站位于寺仙镇东侧约500米处,占地面积540亩,静态投资约72.3亿元,建设阀厅、主辅控楼、综合楼等建筑物及电气设备、给排水设施、通信系统等,预计2025年建成投产。据了解,陕北—安徽±800kV特高压直流输电工
3月11日,哈密—重庆±800千伏特高压直流输电工程启动基础开挖及浇筑作业,标志着基础施工全面展开。当日上午10时,巴里坤±800千伏换流站工程现场,几十辆施工车辆来回穿梭,各作业面井然有序,近800名工人不停忙碌。同时,在邻近新疆哈密伊吾县下马崖乡的山脚下哈重±800千伏特高压直流输电线路工程
巴基斯坦当地时间3月4日,默拉直流输电工程商业投运后的首次大型综合检修工作圆满完成。本次综合检修采用“4+4+2”双极轮停和双极共停模式,共用时10天,折算双极停电时间124.4小时,比计划停电时间节约了13.6小时,其间共开展换流站、直流线路检修试验1719项,累计消除缺陷792项。中国电力技术装备有
2月22日,陇东-山东±800千伏特高压直流输电工程线路工程(河北段)在N1881基础施工现场举行复工仪式,标志着该特高压线路工程河北段正式复工。该工程(河北段)是河北南部电网首个复工的特高压线路工程,河北段起自山西省长治市平顺县与河北省邯郸市涉县省界(N1801塔),止于山东省聊城市莘县董杜庄
2024年1月24日在湖南省第十四届人民代表大会第二次会议上,毛伟明作湖南省政府工作报告。各位代表:现在,我代表省人民政府,向大会作政府工作报告,请予审议,并请各位政协委员提出意见。一、过去一年工作回顾2023年是全面贯彻党的二十大精神的开局之年,是三年新冠疫情防控转段后经济恢复发展的一年
“针对冬季施工环境和天气变化,我们加强现场过程管控,做好隐患排查治理工作,尤其做好吊装、组塔等重要工序管控,确保现场安全、质量始终处于可控、能控、在控状态。”1月27日,河北省送变电有限公司陇东—山东±800千伏特高压直流输电工程线路工程(冀1标)项目部进行安全技术交底时,工程现场管理
隆冬,贺兰山下,金黄无际,沙丘纵横。宁湘直流特高压工程送端中宁±800千伏换流站现场内,参建人员稳稳操作各种机械车辆、浇筑奔涌而出的混凝土、绑扎出整齐美观的钢筋、精心进行各种基础支模……施工的繁忙喧嚣,扰动了大漠的冬日冻寂。工程主体开工短短近两月后,原站址的沙漠地表不断换上“新妆”
北极星输配电网获悉,近日,根据建设项目环境影响评价审批程序的有关规定,2023年12月29日生态环境部部受理1个核与辐射建设项目环境影响评价文件。文件涉及:陕北-安徽±800kV特高压直流输电工程环境影响报告书建设地点:陕西、河南、安徽建设单位:国家电网有限公司公示期为2024年1月2日—2024年1月15
12月13日至15日,国网甘肃电网建设事业部组织开展宁夏~湖南±800千伏特高压直流输电工程(一标)线路工程已机械化施工基础分阶段结算。宁夏~湖南±800千伏特高压直流输电工程甘肃段作为全机械化施工试点工程,自开工以来,稳步推进机械化施工。此结算过程中,重点核查了施工图纸工程量、机械化施工方
记者7日从国网新疆电力有限公司获悉,截至目前,2023年新疆两条直流输电工程外送电量已突破1000亿千瓦时,较2022年同期增长1.9%,助“疆电外送”实现稳定增长。新疆具有丰富的风能、太阳能、水能等能源资源。公开资料显示,新疆风能资源总储量8.9亿千瓦。“疆电外送”可在促进优势资源转化的同时,让新
4月18日,国家电网有限公司直流技术中心完成±800千伏白鹤滩—江苏特高压直流工程控制参数分析整定。控制参数是直流控制保护的“运行代码”,其正确性关系到直流输电工程安全稳定运行。今年以来,国网直流中心已累计解决直流工程重要参数问题242项,编制控制参数清单732份、整定报告24份,并将相关文件
近日,南方电网超高压公司修试中心牵头的团体标准《柔性直流换流阀设备监造技术规范》(以下简称“该标准”)草案稿完成了专家评审,与会七位行业知名专家和代表对该标准的起草工作表示认可,会议要求标准起草工作组依据会议审查意见进行修改和完善,尽快完成标准报批稿。据悉,目前国际上和国内尚无专
10月9日,随着双极带电调试工作完成,±320千伏厦门柔性直流输电工程可靠性提升改造圆满完成,厦门地区电网运行可靠性进一步提升。据了解,厦门柔性直流工程可靠性提升改造是国家电网有限公司年度设备管理重点工作任务,不仅可以提升清洁能源输送能力,还可快速调节厦门岛内电网的无功功率,稳定电网电
10月9日,随着双极带电调试工作完成,±320千伏厦门柔性直流输电工程可靠性提升改造圆满完成,厦门地区电网运行可靠性进一步提升。据了解,厦门柔性直流工程可靠性提升改造是国家电网有限公司年度设备管理重点工作任务,不仅可以提升清洁能源输送能力,还可快速调节厦门岛内电网的无功功率,稳定电网电
截至4月15日晚,我国第四大水电站乌东德水电站累计生产发电达200亿度。南方电网通过世界首个特高压柔性直流工程——乌东德电站送电广东广西特高压多端柔性直流示范工程(以下简称“昆柳龙直流工程”)等特高压线路,已累计把其中140亿度电送往粤港澳大湾区,相当于为广东减少二氧化碳排放456万吨。
12月27日,由南方电网公司投资建设的国家西电东送重点工程乌东德电站送电广东广西特高压多端柔性直流示范工程(简称昆柳龙直流工程)正式启动投产送电。特变电工为该工程发送端昆北换流站提供14台高端换流变、为接收端广东龙门站提供24台±800kV干式桥臂电抗器、为接收端广西柳北换流站提供2套±800kV
12月27日,记者从乌东德电站送电广东广西特高压多端直流示范工程投产仪式(贵州分会场)上获悉,乌东德电站送电广东广西特高压多端直流示范工程(简称“昆柳龙柔性直流工程”)已实现全面投产。乌东德电站送电广东广西特高压多端直流示范工程是落实国家西电东送部署、推动能源清洁低碳转型发展的世界级输电
9月20日,随着昆柳龙直流工程柳北换流站极1高端阀厅柔性直流换流阀功率模块吊装开始,昆柳龙直流工程高端柔直阀进入全面安装阶段。这是超高压公司在全面打响昆柳龙直流工程三端投产“攻坚战”后取得的一个标志性节点胜利。昆柳龙直流工程采用±800千伏特高压多端柔性直流输电技术,是当前世界上电压等
“昆柳龙直流工程全部建成后,将创造17项世界纪录,标志着我国直流输电工程技术再上一个新台阶。作为世界上首个多端柔性直流工程,它将柔性直流技术带入了一个新时代。”中国工程院院士李立浧表示。昆柳龙直流工程在世界上首次采用特高压多端直流系统。工程全部建成后将创造17项世界第一,包括世界上第
云南至广东柔性直流双极低端调试通过,现在正式投产!7月31日,由南方电网公司投资建设的国家西电东送重点工程——乌东德电站送电广东广西特高压多端直流示范工程(简称昆柳龙直流工程)提前实现阶段性投产。(来源:微信公众号“南网50Hz”ID:csg50Hz作者:张伟雄窦小兵辛镇瀚董跃周)这是世界上第一
6月29日,世界首个具有网络特性的柔性直流电网工程,张北柔性直流电网试验示范工程投运,张北地区的新能源成功接入北京电网、送至2022年北京冬奥场馆。张北柔直工程是世界上电压等级最高、输送容量最大的柔性直流工程,也是国家电网有限公司深入贯彻党中央、国务院决策部署、服务能源清洁低碳发展的重
请使用微信扫一扫
关注公众号完成登录
姓名: | |
性别: | |
出生日期: | |
邮箱: | |
所在地区: | |
行业类别: | |
工作经验: | |
学历: | |
公司名称: | |
任职岗位: |
我们将会第一时间为您推送相关内容!